x
u b i x a

Physical Testing

UBIXA provides physical tests on the all kinds of Construction material with all the parameters as per the latest Indian Standards. We have calibrated, accurate, highquality, and computerized setups for testing. We provide in-house testing as per Indian Standards and ISO 17025:2017 accreditation

Cement | Concrete | Bitumen | Steel | Soil | Fly Ash | Coarse & Fine aggregate | Bricks | Paver Block | AAC block | HDPE Pipe | Paint

Career Illustration
Cement
Sr.No Name of Test Minimum Period required for testing Minimum Sample required for One Test Test Method / Specification
1 Fineness (Dry Sieve Method) 1 Day 1 kg IS 4031(Part-1):1996 RA : 2016
2 Fineness (Blaine Air Permeability) 1 Day 1 kg IS 4031(Part-2):1999 RA: 2018
3 Soundness (Le-Chatelier Method) 1 Day 2 kg IS 4031(Part-3):1988 RA: 2019
4 Standard Consistency 1 Day 2 kg IS 4031(Part-4):1988 RA: 2019
5 Initial and Final Setting Time 2 Day 3 kg IS 4031(Part-5):1988 RA: 2019
6 Compressive Strength 3 to 28 Days 1 FULL BAG IS 4031(Part-6):1988 RA: 2019
7 Specific Gravity and Density 1 Day 1 kg IS 4031(Part-11):1988 RA: 2019
Concrete
Sr.No Name of Test Minimum Period required for testing Minimum Sample required for One Test Test Method / Specification
1 Compressive Strength (20 KN to 2000KN) (Set of 3 Cubes) 3, 7, 28 Days 1 Set (3 Cube) IS 516 (Part 1/Sec 1) : 2021
2 Flexural Strength of Concrete 3, 7, 28 Days 1 Set (3 Cube) IS 516 (Part 1/Sec 1) : 2021
Bitumen
Sr.No Name of Test Minimum Period required for testing Minimum Sample required for One Test Test Method / Specification
1 Pentration Test 1 Day 500 gm Is 1203:2019
2 Softening Point 1 Day 500 gm IS 1205 Amd No.- 1:2019
3 Specific gravity 1 Day 500 gm IS 1202:2019
4 Ductility 1 Day 500 gm IS 1208Amd No.-2:2019
5 Preparation of Marshal Moulds 2 Day 2 Bag Aggregate 2 Bag Dust 500 gm Bitumen ASTM D2172
6 Marshal Stability (Testing of specimen) 2 Days 1 Core Sample ASTMD6927:2015
7 Bitumen Extraction Test 1 Day 1 Core Sample ASTM D2172
8 Flash Point (Cleveland Open cup) 1 Day 500 gm IS: 1209 / IS: 1448 Pt 69
9 Kinematic/Absolute Viscosity 2 Day 500 gm IS 1206:1978 RA:2022
10 Design of Bituminous Mix (SDBC, BC, DBM Grade II) 2 Day 2 Bag Aggregate 2 Bag Dust 500 gm Bitumen As Per Morth
10 Bituminous Macadam (BM) Mix 2 Day 2 Bag Aggregate 2 Bag Dust 500 gm Bitumen As Per Morth
Steel
Sr.No Name of Test Minimum Period required for testing Minimum Sample required for One Test Test Method / Specification
1 % Elongation 1 Day 3 Bar (1 Meter) Each IS 1608 (Part-1): 2005
2 Nominal Unit Weight of Steel 1 Day 3 Bar (1 Meter) Each IS 1786: 2018
3 Ultimate Tensile Strength 1 Day 3 Bar (1 Meter) Each IS 1608 (Part-1): 2005
4 Yield Stress 1 Day 3 Bar (1 Meter) Each IS 1608 (Part-1): 2005
5 Bend & Rebend Test 1 Day 3 Bar (1 Meter) Each IS- 1599: 2012, IS- 1786: 2008
Soil
Sr.No Name of Test Minimum Period required for testing Minimum Sample required for One Test Test Method / Specification
1 Pentration Test 1 Day 500 gm Is 1203:2019
2 Softening Point 1 Day 500 gm IS 1205 Amd No.- 1:2019
3 Specific gravity 1 Day 500 gm IS 1202:2019
4 Ductility 1 Day 500 gm IS 1208Amd No.-2:2019
5 Preparation of Marshal Moulds 2 Day 2 Bag Aggregate 2 Bag Dust 500 gm Bitumen ASTM D2172
6 Marshal Stability (Testing of specimen) 2 Days 1 Core Sample ASTMD6927:2015
7 Bitumen Extraction Test 1 Day 1 Core Sample ASTM D2172
8 Flash Point (Cleveland Open cup) 1 Day 500 gm IS: 1209 / IS: 1448 Pt 69
9 Kinematic/Absolute Viscosity 2 Day 500 gm IS 1206:1978 RA:2022
10 Design of Bituminous Mix (SDBC, BC, DBM Grade II) 2 Day 2 Bag Aggregate 2 Bag Dust 500 gm Bitumen As Per Morth
10 Bituminous Macadam (BM) Mix 2 Day 2 Bag Aggregate 2 Bag Dust 500 gm Bitumen As Per Morth
Fly Ash
> >
Sr.No Name of Test Minimum Period required for testing Minimum Sample required for One Test Test Method / Specification
1 Water Content by Oven Drying Method 2 Day 2 Kg IS 2720(Part-2):1973 RA: 2020
2 Specific Gravity 1 Day 1 Kg IS 2720(Part 3/ Section-2):1980 RA: 2016
3 Grain Size Analysis by Sieving 2 Day 5 Kg IS: 2720 (Part 4): 1985 RA:2020
4 Liquid Limit by Cone Penetrometer 3 Day 1 Kg IS 2720(Part-5):1985 RA: 2020
5 Plastic Limit 1 Day 1 Kg IS 2720(Part-5):1985 RA: 2020
6 Shrinkage Limit 1 Day 1 Kg IS 2720(Part-5):1985 RA: 2020
7 Light Compaction (MDD) & (OMC) i.e. Standard Proctor Compaction 2 Day 20 Kg IS 2720(Part-7):1980 RA: 2016
8 Heavy Compaction (MDD) & (OMC) Modified Proctor Compaction 2 Days 20 Kg IS 2720(Part-8):1983 RA: 2020
9 California Bearing Ratio (CBR) a) Soaked b) Un Soaked 6 Days 3 Days 35 Kg IS 2720(Part-16):1987 RA: 2016
10 Permeability by Falling Head Method 3 Day 20 Kg IS 2720(Part-17):1986 RA: 2016
11 Free Swell Index 2 Day 2 Kg IS 2720(Part-40):1986 RA: 2016
12 Direct Shear Test 4 Day 20 Kg IS 2720(Part-13):1986 RA:2020
13 Unconfined Compressive Strength Test 3 Day 4 Kg IS 2720(Part-10):1991 RA:2020
14 Chemical Analysis of Soil 3 Day 5 Kg IS 2720-(Part-26):1983 RA: 2016
Coarse & Fine aggregate
Sr.No Name of Test Minimum Period required for testing Minimum Sample required for One Test Test Method / Specification
1 Grain Size Analysis/Sieve Analysis 1 Day 10 Kg IS 2386(Part-1):1963 RA: 2016
2 Material finer than 75 microns 1 Day 10 Kg IS 2386(Part-1):1963 RA: 2016
3 Elongation Index 1 Day 20 Kg IS 2386(Part-1):1963 RA: 2016
4 Flakiness Index 1 Day 20 Kg IS 2386(Part-1):1963 RA: 2016
5 Organic Impurities 1 Day 12 Kg IS 2386(Part-2):1963 RA: 2016
6 Bulk Density & % Voids 1 Day 10 Kg IS 2386(Part-3):1963 RA: 2016
7 Specific Gravity & Water Absorption 1 Day 5 Kg IS 2386(Part-3):1963 RA: 2016
8 10% fine Value 1 Day 5 Kg IS 2386(Part-4):1963 RA: 2016
9 Aggregate Crushing Value 1 Day 10 Kg IS 2386(Part-4):1963 RA: 2016
10 Aggregate Impact Value 1 Day 10 Kg IS 2386(Part-4):1963 RA: 2016
11 Los Angles Abrasion Test 1 Day 20 Kg IS 2386(Part-4):1963 RA: 2016
12 Aggregate Stripping Value 2 Day 2 Kg IS 6241:1971 RA:2017
Fine Aggregate
Sr.No Name of Test Minimum Period required for testing Minimum Sample required for One Test Test Method / Specification
1 Material finer than 75 microns 1 Day 10 Kg IS 2386(Part-1):1963 RA: 2016
2 Sieve Analysis 1 Day 10 Kg IS 2386(Part-1):1963 RA: 2016
3 Organic Impurities 1 Day 10 Kg IS 2386(Part-2):1963 RA: 2016
4 Silt Content 1 Day 5 Kg IS 2386 (Part-2):1963 RA:2016
5 Bulk Density & % Voids 1 Day 5 Kg IS 2386(Part-3):1963 RA: 2016
6 Specific Gravity & Water Absorption 1 Day 5 Kg IS 2386(Part-3):1963 RA: 2016
7 Surface Moisture Content 1 Day 5 Kg IS 2386(Part-3):1963 RA: 2016
Bricks
Sr.No Name of Test Minimum Period required for testing Minimum Sample required for One Test Test Method / Specification
1 Compressive Strength 3 Days 10 Nos. IS 3495(Part-1):1992 RA:2019
2 Water Absorption 2 Days 10 Nos. IS 1077:1992 RA: 2016
2 Efflorescence 2 Days 10 Nos. IS 3495 (Part-3):2019
4 Dimension (LxWxH) for 20 bricks 1 Day 10 Nos. IS 3495(Part-2):1992 RA:2019
Paver Bricks
Sr.No Name of Test Minimum Period required for testing Minimum Sample required for One Test Test Method / Specification
1 Water Absorption 3 Days 8 Nos. IS 15668 (2006) RA: 2017
2 Compressive Strength 3 Days 8 Nos. IS 15668 (2006) RA: 2017